Project Description

Design and construction of a new 30 bed Adolescent Eating Disorder Unit built over the existing facility. Installation of 3 floor lift and raised consult rooms connected via a foot bridge to the existing level 1. Complete installation of all new services and carpark re-leveling. The existing ground floor reception and shared space areas were also completed as part of the project. All works were completed in line with Health Facility Guidelines for Mental Health Construction.

Project Details

Phone

NSW: 02 8188 0700
VIC/TAS: 0448 651 490

NSW Office

60 Strathallen Avenue,
Northbridge
NSW 2063

TAS / VIC Office

Suite 3.13
737 Burwood Rd
Hawthorn
East Vic 3123

Email

info@erilyan.com.au